Heavy storage tank for sea transport of methanol
Double-walled methanol tank with operating pressure 1,5 bar
- Solid construction with engine room on one end to accommodate the on-site hose reel for refueling the container on board.
- The Shipbuilding door allows access to the one behind it Engine room. Heavy tank connection flanges are installed here for filling and removing the tank.
- The is located under the protective cover in the side reinforcement niche Vacuum leak detector for the double-walled steel tank.
- In the roof rack of this methanol storage tank there are connection points for attaching the roof platform and surrounding parapet. The ground connections on the floor assembly.
- There is one in the engine tank ceiling Roof closure hood installed to insert the hose drum using a crane. Also a hood section with entry dome and connection sleeve for sensors.